Varadkar, LeoThursday, 13 February 2014 |
Dáil Éireann Debate |
Penalty Points System Offences
Was asked: the number of drivers who have obtained the maximum 12 penalty points in the years 2011, 2012 and 2013 who are now disqualified from driving; and the number of drivers who have obtained the maximum...
The number of drivers who have obtained 12 penalty points in the years 2011, 2012 and 2013 and consequently were disqualified from driving for a period of six months under Section 3 of the Road Tr...
Public Service Obligation Services
Was asked: if he will confirm that the Dublin Bus routes that will be publicly tendered under the PSO contract will be obliged to offer full ticketing integration with both Dublin Bus and the Leap card; and i...
Was asked: if he will confirm that the Dublin Bus routes that will be publicly tendered under the PSO contract will be obliged to offer full wheelchair accessibility; and if he will make a statement on the ma...
Was asked: if he will confirm that the Dublin Bus routes that will be publicly tendered under the PSO contract will be obliged to accept bus passes as per the present arrangements; and if he will make a state...
I propose to take Questions Nos. 289 to 291, inclusive, together.
The issues raised are matters for the National Transport Authority (NTA) and I have referred the Deputy's ques...
Road Toll Operators
Was asked: the dividends paid out to each of the partners involved in the East Link Bridge for each of the past 29 years; and if he will make a statement on the matter.
The East Link toll bridge was opened in October 1984. It was built on foot of an agreement between Dublin City Council and NTR and therefore my Department was not a party to the agreement. &n...
Rural Transport Programme
Was asked: the progress made to date in reforming rural transport; the integration of the various schemes, including school bus, Bus Éireann and Health Service Executive transport schemes; and if he will make...
Visa Waiver Programme
Was asked: the list of countries that have been included in the visa waiver programme; the tourism numbers from those countries that have already been included; the potential numbers that are being projected ...
The short-stay visa waiver programme falls within the responsibilities of my colleague the Minister for Justice and Equality. The programme, which was launched in 2011, allows visitors or business...
Road Safety
Was asked: if he will request the National Roads Authority to examine the bend in the road on the N11 as it enters Donnybrook to see what measures can be put in place to reduce the speed of vehicles as they c...
Was asked: if he will provide emergency funding for raised traffic lights on the N11 at the existing pedestrian crossing by Leinster’s Donnybrook rugby grounds in view of the speed at which vehicles approach ...
I propose to take Questions Nos. 295 and 296 together.
The road mentioned by the Deputy no longer forms part of the N11 but was re-designated as a regional road. &nb...
Parking Provision
Was asked: when he plans to introduce regulations permitting local authorities to introduce by-laws that would designate electric vehicle charging points on public roads as electric vehicle parking only, as w...
Draft regulations to provide for charging points for electric vehicles and for on-street parking spaces for car clubs are currently being finalised by the Office of the Attorney General. These regu...
Cycling Facilities Provision
Was asked: if the National Transport Authority has completed its consideration and approval of the detailed designs for the S2S; and, if not, when same is expected to occur.
The development of the Sutton to Sandycove, or S2S, route and all other cycling facilities within the Greater Dublin Area is a matter for the National Transport Authority (NTA) in conjunction with ...
Public Transport Initiatives
Was asked: the terms of reference of the consultation for the bus rapid transit corridor and swiftway system which commences on 17 February 2014; with whom will the final route decisions rest; and the role of...
The NTA has statutory responsibility for developing public transport infrastructure in the Greater Dublin Area (GDA) including Bus Rapid Transit (BRT) projects.
I understand that the NTA is commencing a non-statutory public consultation on 17th February 2014 in relation to the proposals that it is developing in respect of a possible BRT service for Dubli...
The NTA has advised that the development of each BRT corridor will require the preparation and publication of an environmental impact statement and its submission to An Bord Pleanála for determin...
Was asked: if he will provide a breakdown of funding provided by his Department for upgrading bus lanes and QBCs on the north side of Dublin; and if he will make a statement on the matter.
As Minister for Transport, Tourism and Sport I have responsibility for policy and overall funding in relation to public transport. Following the establishment of the National Transport Authority (...
Noting this I have referred the Deputy's question to the NTA. Please advise my private office if you do not receive a reply within 10 working days.
Was asked: his views on rapid bus plans for Dublin; and if he will make a statement on the matter.
The NTA has statutory responsibility for developing public transport infrastructure in the Greater Dublin Area (GDA) including Bus Rapid Transit (BRT). Preparatory planning work is being overseen ...